Dynamic Forge Completes Hot Induction Bends for Oil India’s DNPL Gas Pipeline Project

Dynamic Forge & Fittings has completed manufacturing hot induction bends for Oil India’s Duliajan–Numaligarh Gas Pipeline project, meeting stringent technical specifications.

March 10, 2026

Dynamic Forging final
Courtesy: Dynamic Forge & Fittings (I) Pvt. Ltd.

Dynamic Forge & Fittings (I) Pvt. Ltd. has announced the successful production of hot induction bends for the Oil India Limited Duliajan–Numaligarh Gas Pipeline (DNPL) project. The components were manufactured to meet strict engineering and quality requirements for critical pipeline infrastructure.

The bends were produced using TMCP line pipes to ensure enhanced strength and toughness, along with one-metre tangent lengths to meet precise pipeline design specifications. The manufacturing process also included Post Bend Heat Treatment (PBHT) to achieve optimal mechanical properties.


Also Read: Jindal Steel Dispatches Its First Lot of Steel Plates from its New Heat Treatment Complex in Raigarh


To ensure operational reliability and safety, the components underwent 100% hydrostatic testing under witnessed inspection. The company stated that the project reflects its focus on precision engineering, stringent quality control, and reliable solutions for demanding pipeline applications

Share this post:

Related Posts

Recent Posts

Subscribe Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

WordPress Ads