Surya Roshni Limited is set to invest INR 400 million to upgrade their cold rolling plant at Bahadurgarh, Haryana. The investment will increase the production capacity from 1,15,000 MT per annum to 1,50,000 MT per annum.
Aug 11, 2023
Surya Roshni Limited approved an investment of INR 400 million for the upgradation of the cold rolling (CR) plant at Bahadurgarh Plant (Haryana). The investment will enhance the capacity by 35,000 MT per annum. The project is scheduled for commissioning by the end of July 2024. The objective behind the up-gradation/modification of the cold rolling plant is to achieve better surface quality and shape of the material. It will also meet the closed thickness tolerance for some main segments like stamping, and cycle rim and be able to add some wider auto-stacking stamping as per market requirements. The above upgrade of the plant will help to reduce the percentage of rejection of the material. Currently, the production capacity of the plant is approximately 1,15,000 MT per annum and after up-gradation, the production capacity will increase to 1,50,000 MT per annum with better surface quality and shape of the material and increase the margins.